Inspection of SH Road & RR Road by officials of Engineering wing (APWD) & PRIs Members

Port Blair, Sept 12: An inspection of State Highway road & Rural Road was carried out on 12/09/2019 by Chief Engineer, Mr. D. Balaji, Superintending Engineer, Mr. Tej Bahadur, APWD along with AE & JE, APWD at Tushnabad village & Collinpur Gram Panchayat to inspect the ongoing construction works of SH road extending from Tushnabad Bangali Basti to Collinpur Gram Panchayat and RR road from Collinpur junction to Collinpur beach. During the course of inspection CE interacted with the villagers of both the Panchayats along with the  Pradhan of G.P. Collinpur, Mr. Mahadev Majhi, Pradhan G.P. Mithakhari, Mr. Mohammed Safique, Zilla Parishad Member of the Tushnabad constituency, Mr. Subir Chander & Panchayat Samiti Member, Mr. Bikash Biswas and other PRI members. CE directed the concerned officers to start the repair work of road immediately today itself, He also informed that the tender of Rural Road from Collinpur junction to Collinpur beach was cancelled as no any contractor  participated in the tender process. And also assured that the tender of  the same  will be floated soon, after having a pre tender discussion with the enlisted contractors and briefing them about the flexibility in the work.

Leave a Reply

Your email address will not be published.